Posted on May 13, 2012 from Twitterrific

Box 1 is done. 3 more to go. Approximately half the structure is built. 74 steps, p86 http://img.ly/iaVe

Twitter username:

@

Box 1 is done. 3 more to go. Approximately half the structure is built. 74 steps, p86 http://img.ly/iaVe